| Volume
1 |
| Download
Full Volume 1 Document (202.6 MB) |
| Cover
(1.1 MB) |
| Table
of Contents (125 K) |
| Summary
(276 K) |
|
ES.1 |
Project
Description |
|
ES.2 |
Project
Objectives |
|
ES.3 |
Draft EIR |
|
ES.4 |
Impact Summary |
|
ES.5 |
Alternatives
to the Proposed LRDP |
|
ES.6 |
Known Areas
of Controversy |
| 1. |
Introduction
(64 K) |
|
1.1 |
Purpose
of the EIR |
|
1.2 |
Overview
of the UC Merced LRDP |
|
1.3 |
Project
Background |
|
1.4 |
EIR Review
Process |
|
1.5 |
Uses of
the LRDP EIR |
|
1.6 |
Levels of
Significance |
|
1.7 |
Organization
of the EIR |
| 2. |
Project
Description (24.9 MB) |
|
2.1 |
Introduction |
|
2.2 |
Project
Location |
|
2.3 |
Project
Objectives |
|
2.4 |
Academic
Program |
|
2.5 |
Campus Population |
|
2.6 |
LRDP Elements |
|
|
2.6.1 |
Main Campus |
|
|
2.6.2 |
Campus Land
Reserve |
|
|
2.6.3 |
Campus Natural
Reserve |
|
2.7 |
Public Services |
|
|
2.7.1 |
Fire Protection |
|
|
2.7.2 |
Police Services |
|
|
2.7.3 |
Child Care
Facilities |
|
2.8 |
Utilities |
|
|
2.8.1 |
Potable
Water/Fire Water |
|
|
2.8.2 |
Irrigation
Water |
|
|
2.8.3 |
Storm Water |
|
|
2.8.4 |
Wastewater |
|
|
2.8.5 |
Solid Waste |
|
|
2.8.6 |
Hazardous
Waste |
|
|
2.8.7 |
Telecommunications |
|
|
2.8.8 |
Electricity |
|
|
2.8.9 |
Natural
Gas |
|
|
2.8.10 |
Heating
and Cooling Systems |
|
|
2.8.11 |
Utility
Tunnel |
|
|
2.8.12 |
Physical
Plant Support Facilities |
|
2.9 |
Conceptual
Site Development Plan |
|
2.10 |
Campus Planning
Considerations |
|
2.11 |
Distributed
Learning Centers |
|
2.12 |
Potential
Campus Growth Scenarios and Other Contingencies |
|
2.13 |
Related
Projects |
|
|
2.13.1 |
University
Community |
|
|
2.13.2 |
Campus Parkway |
|
|
2.13.3 |
Environmental
Analysis of Combined Projects |
|
2.14 |
Project
as Evaluated in the Site Selection EIR |
| 3. |
Demographic
Characteristics (66 K)
|
|
3.1 |
Population |
|
|
3.1.1 |
Existing
and Projected Population in the County |
|
|
3.1.2 |
Project-Related
Population Changes |
|
3.2 |
Employment |
|
|
3.2.1 |
Existing
and Projected Employment in the County |
|
|
3.2.2 |
Project-Related
Employment Changes |
|
3.3 |
Demographic
Assumptions Used in Impact Analyses |
|
|
3.3.1 |
Scenario
Analyzed in Sections 4.11, 4.12, and 4.15 of the EIR |
|
|
3.3.2 |
Scenario
Analyzed in Sections 4.3, 4.10, and 4.14 of the EIR |
| 4. |
Environmental
Setting, Impacts, and Mitigation (20 K) |
|
4.1 |
Aesthetics
(11.3 MB) |
|
|
4.1.1 |
Summary
of Site Selection EIR Impacts and Mitigation Measures |
|
|
4.1.2 |
Environmental
Setting |
|
|
4.1.3 |
Impacts
and Mitigation |
|
4.2 |
Agricultural
Resources (7.4 MB) |
|
|
4.2.1 |
Summary
of Site Selection EIR Impacts and Mitigation Measures |
|
|
4.2.2 |
Environmental
Setting |
|
|
4.2.3 |
Impacts
and Mitigation |
|
4.3 |
Air
Quality (171 K) |
|
|
4.3.1 |
Summary
of Site Selection EIR Impacts and Mitigation Measures |
|
|
4.3.2 |
Environmental
Setting |
|
|
4.3.3 |
Impacts
and Mitigation |
|
4.4 |
Biology
Resources (81.8 MB) |
|
|
4.4.1 |
Summary
of Site Selection EIR Impacts and Mitigation Measures |
|
|
4.4.2 |
Environmental
Setting |
|
|
4.4.3 |
Impacts
and Mitigation |
|
|
4.4.4 |
Compliance
with Regulatory Process |
|
4.5 |
Cultural
Resources (114 K) |
|
|
4.5.1 |
Summary
of Site Selection EIR Impacts and Mitigation Measures |
|
|
4.5.2 |
Environmental
Setting |
|
|
4.5.3 |
Impacts
and Mitigation |
|
4.6 |
Geology,
Soils, Seismicity, and Mineral Resources (10
MB) |
|
|
4.6.1 |
Summary
of Site Selection EIR Impacts and Mitigation Measures |
|
|
4.6.2 |
Environmental
Setting |
|
|
4.6.3 |
Impacts
and Mitigation |
|
4.7 |
Hazards
and Hazardous Material (110 K) |
|
|
4.7.1 |
Summary
of Site Selection EIR Impacts and Mitigation Measures |
|
|
4.7.2 |
Environmental
Setting |
|
|
4.7.3 |
Impacts
and Mitigation Measures |
|
4.8 |
Hydrology
and Water Quality (511 K) |
|
|
4.8.1 |
Summary
of Site Selection EIR Impacts and Mitigation Measures |
|
|
4.8.2 |
Environmental
Setting |
|
|
4.8.3 |
Impacts
and Mitigation |
|
|
4.8.4 |
Compliance
with the Basin Plan |
|
4.9 |
Land
Use and Planning (2.1 MB) |
|
|
4.9.1 |
Summary
of Site Selection EIR Impacts and Mitigation Measures |
|
|
4.9.2 |
Environmental
Setting |
|
|
4.9.3 |
Impacts
and Mitigation |
|
4.10 |
Noise
(574 K) |
|
|
4.10.1 |
Summary
of Site Selection EIR Impacts and Mitigation Measures |
|
|
4.10.2 |
Environmental
Setting |
|
|
4.10.3 |
Impacts
and Mitigation |
|
4.11 |
Population,
Employment, and Housing (43 K) |
|
|
4.11.1 |
Summary
of Site Selection EIR Impacts and Mitigation Measures |
|
|
4.11.2 |
Environmental
Setting |
|
|
4.11.3 |
Existing
and Projected Housing in the County |
|
|
4.11.4 |
Impacts
and Mitigation |
|
4.12 |
Public
Services (87 K) |
|
|
4.12.1 |
Summary
of Site Selection EIR Impacts and Mitigation Measures |
|
|
4.12.2 |
Environmental
Setting |
|
|
4.12.3 |
Impacts
and Mitigation |
|
4.13 |
Recreation
(63
K)
|
|
|
4.13.1 |
Summary
of Site Selection EIR Impacts and Mitigation Measures |
|
|
4.13.2 |
Environmental
Setting |
|
|
4.13.3 |
Impacts
and Mitigation Measures |
|
4.14 |
Traffic,
Circulation, and Parking (519 K) |
|
|
4.14.1 |
Summary
of Site Selection EIR Impacts and Mitigation Measures |
|
|
4.14.2 |
Environmental
Setting |
|
|
4.14.3 |
Impacts
and Mitigation Measures |
|
4.15 |
Utilities
(99 K) |
|
|
4.15.1 |
Summary
of Site Selection EIR Impacts and Mitigation Measures |
|
|
4.15.2 |
Environmental
Setting |
|
|
4.15.3 |
Impacts
and Mitigation |
| 5. |
Alternatives
to the Proposed Project (62.3 MB) |
|
5.1 |
On-Site
Alternatives |
|
|
5.1.1 |
Alternative
Main Campus Sizes |
|
|
5.1.2 |
Alternative
Locations on the Virginia Smith Trust Site |
|
5.2 |
Off-Site
Alternatives |
|
|
5.2.1 |
Alternative
Sites in Merced County |
|
|
5.2.2 |
Sites Previously
Evaluated in the Site Selection EIR |
|
5.3 |
No-Project
Alternative |
|
5.4 |
Environmentally
Superior Alternative |
| 6. |
Growth
Inducing Impacts (50 K) |
|
6.1 |
Near-Term
Growth Impacts |
|
|
6.1.1 |
Campus-Related
Direct Jobs |
|
|
6.1.2 |
Campus-Related
Indirect and Induced Jobs |
|
|
6.1.3 |
Near-Term
Population Growth |
|
|
6.1.4 |
Geographical
Pattern of Near-Term Growth |
|
6.2 |
Far-Term
Growth Impacts |
|
|
6.2.1 |
Campus-Related
Direct Jobs |
|
|
6.2.2 |
Campus-Related
Indirect and Induced Jobs |
|
|
6.2.3 |
Other Campus-Related
Induced Jobs |
|
|
6.2.4 |
Far-Term
Population Growth |
|
|
6.2.5 |
Geographic
Pattern of Far-Term Growth |
|
|
6.2.6 |
Environmental
Effects From Growth in Business/Urban Services |
|
6.3 |
Growth Triggered
by the Provision of Infrastructure |
|
6.4 |
Impacts
and Mitigation |
|
|
6.4.1 |
Standards
of Significance |
|
|
6.4.2 |
Project
Impacts and Mitigation |
| 7. |
Other
CEQA Considerations (28 K) |
|
7.1 |
Significant
and Unavoidable Environmental Impacts |
|
7.2 |
Significant
Irreversible Changes |
|
|
7.2.1 |
Irretrievable
Commitment of Construction Materials |
|
|
7.2.2 |
Loss of
Agricultural and Biological Resources |
|
|
7.2.3 |
Increased
Use of Natural Resources Because of Increased Population |
| 8. |
Consultation
and Coordination (16 K) |
| 9. |
List
of Preparers and Contributors (111 K) |
Volume 2 |
| Download
Full Volume 2 Document (94.9 MB) |
| Cover
(1.2 MB) |
| Table
of Contents (108 K) |
| Executive
Summary (58 K) |
| 1. |
Introduction
(25 K) |
|
1.1 |
Purpose
of the Phase 1 Impact Analysis |
|
1.2 |
Overview
of the UC Merced Phase 1 Campus |
|
1.3 |
Phase 1
Impact Analysis Review Process/Relationship to the LRDP and Volume
1 of the LRDP EIR |
|
1.4 |
Organization
of the Phase 1 Impact Analysis |
| 2. |
Project
Description (17.8 MB) |
|
2.1 |
Phase 1
Campus Location |
|
2.2 |
Phase 1
Project Need and Objectives |
|
2.3 |
Academic
Program |
|
2.4 |
Campus Population |
|
2.5 |
Phase 1
Campus Land Uses |
|
2.6 |
Phase 1
Campus Facilities |
|
|
2.6.1 |
Science
and Engineering Building |
|
|
2.6.2 |
Classroom
and Office Building |
|
|
2.6.3 |
Library/Information
Technology Center |
|
|
2.6.4 |
Student
Housing2004 |
|
|
2.6.5 |
Logistical/Support
Services Facilities Building |
|
|
2.6.6 |
Social Science
and Management Building |
|
|
2.6.7 |
Second Science
and Engineering Building |
|
|
2.6.8 |
Student
Housing2008 |
|
|
2.6.9 |
Access,
Roadway, and Parking Improvements |
|
|
2.6.10 |
Athletics
and Recreation Facilities |
|
|
2.6.11 |
Public Services |
|
|
2.6.12 |
Utilities |
|
2.7 |
Construction |
|
2.8 |
Permits
and Approvals |
| 3. |
Environmental
Setting, Impacts, and Mitigation (28.7 MB) |
|
3.1 |
Impacts
Adequately Analyzed in Volume 1 |
|
3.2 |
Aesthetics |
|
|
3.2.1 |
Environmental
Setting |
|
|
3.2.2 |
Impacts
and Mitigation Measures
|
|
3.3 |
Air Quality |
|
|
3.3.1 |
Environmental
Setting |
|
|
3.3.2 |
Impacts
and Mitigation Measures |
|
3.4 |
Biology
Resources |
|
|
3.4.1 |
Environmental
Setting |
|
|
3.4.2 |
Impacts
and Mitigation |
|
3.5 |
Cultural
Resources |
|
|
3.5.1 |
Environmental
Setting |
|
|
3.5.2 |
Impacts
and Mitigation |
|
3.6 |
Geology,
Seismicity, and Soils |
|
|
3.6.1 |
Environmental
Setting |
|
|
3.6.2 |
Impacts
and Mitigation Measures |
|
3.7 |
Hazards
and Hazardous Material |
|
|
3.7.1 |
Environmental
Setting |
|
|
3.7.2 |
Impacts
and Mitigation Measures |
|
3.8 |
Noise |
|
|
3.8.1 |
Environmental
Setting |
|
|
3.8.2 |
Impacts
and Mitigation |
|
|
3.8.3 |
Project
Impacts and Mitigation |
|
3.9 |
Recreation |
|
|
3.9.1 |
Environmental
Setting |
|
|
3.9.2 |
Impacts
and Mitigation Measures |
|
3.10 |
Traffic,
Circulation, and Parking |
|
|
3.10.1 |
Environmental
Setting |
|
|
3.10.2 |
Impacts
and Mitigation Measures |
| 4. |
Alternatives
(54 K) |
|
4.1 |
Summary
of Volume 1 Alternatives |
|
|
4.1.1 |
On-Site
Alternatives |
|
|
4.1.2 |
Off-Site
Alternatives |
|
4.2 |
Alternative
Phase 1 Campus Locations on Main Campus |
|
4.3 |
Alternative
Phase 1 Campus Sizes |
|
|
4.3.1 |
Smaller
Phase 1 Campus/Increased Density Alternative |
|
|
4.3.2 |
Smaller
Phase 1 Campus/Fewer On-Site Programs Alternative |
|
4.4 |
Phase 1
Campus No Project Alternative |
|
4.5 |
Environmentally
Superior Alternative |
| 5. |
Other
CEQA Considerations (31 K) |
|
5.1 |
Significant
and Unavoidable Environmental Impacts |
|
5.2 |
Significant
Irreversible Changes |
|
|
5.2.1 |
Irretrievable
Commitment of Construction Materials |
|
|
5.2.2 |
Loss of
Agricultural, Biological, Geological, and Cultural Resources |
|
|
5.2.3 |
Increased
Use of Natural Resources Due to Increased Population |
|
5.3 |
Growth Inducing
Impacts |
| Appendices |
|
A |
Notice
of Preparation (NOP) and Comments Received on the NOP
(30.3 MB) |
|
B |
Air
Quality Model Runs (4.4 MB) |
|
C |
Additional
Biological Resources Information* (12 MB) |
|
|
*In the figures and tables for Appendix C (Additional Biological
Resources Information) of the UC Merced LRDP EIR, the following
editorial corrections should be noted:
- Figure
4 was eliminated, though the reference to Figure 4 in the text
remains
- Figure
7 represents both Figures 7 and 8 from the text (this figure
was mistakenly assigned two numbers)
- Figure
10 represents both Figures 10 and 11 from the text (this figure
was also mistakenly assigned two numbers
|